Installation of a new valve block with complete pipe work for an ATLAS wheeled excavator

In accordance with the 2D-drawing information the space for installation was modelled with SolidEdge®, the ideal location for the installation was identified and the required bracket was designed. Then the pipe-routing was fixed and the pipes designed. All pipes were produced by INTERHYDRAULIC in Selm.
The prototyping was made by INTERLOG and approved by TEREX-ATLAS. Final approval tests were performed at the place of manufacture with the real machine.